Monday, December 21, 2009

7960 Cisco Background

Update

With the ability to place the plastic in a bigger room a month ago I decided to slightly modify the path.

below the image.


In black is shown the part already finished and running (only path). In blue and the missing part in the project (with a possible variant reported in the next circle). The first variant contains two antenna connections to industries with spindle; in second one dispenses with the spindle. The drawstring

"VAGUE Central" has been fully recovered from an old project "Analog" and instantly converted to "digital" was enough to put, in fact, "ON" all the switches that were to isolate or activate various sections of track admission of the convoys: the Digital MIRACLES ....

monster here, some photos of the route completed.
The tracks have not yet heavily and some points need to restore the ties. They will also be made throughout the various buildings and the landscape (how much work is missing!).











Saturday, October 10, 2009

Sebprrbeoc Der,atotos

order to load

I prepared an outline to fill in for the drafting of orders load for freight wagons.
I thought of using the paper method in two phases.



Using a file processed with Excel insert data of stages 1 and 2 of each card (one row of the excel sheet is a paper load, then 2 consecutive phases). Each line is divided into two parts, one for phase 1 and another for phase 2, the first column "Type Wagon" is given only once, while the column "Destination Station", "Recipient", "Station Country of Origin "," Sender "and" Load Type "are given twice, once for Phase 1 and another Step 2.

After filling orders for load line, and you close and save the excel file, I open another file, this time with word and done with the mail merge tool, in practice, this file consists of a sheet of A4 paper which is "filled" from the Excel sheet already completed.



E 'available to download 2 files (Excel and Word) as an explanatory guide to the association of data source on your PC, after downloading:

Readme
Spreadsheet
order to load

Monday, October 5, 2009

Breast Milk Drink Dog

MASSARADICA

Photos of the station with the finished floor tracks (you can see in the picture still gaps between the joints of the tracks, but these have already been filled with sleepers of filling).



Here are some site during the electrical test.



Sunday, September 20, 2009

How To Trim My Pubic Hair

Customers railroad

information to link these 3: Diagram
terminus Massaradica
Scheme station Vago Sant'Andrea
Summary line utilities

Wednesday, September 2, 2009

Delta Initiation Process

Draft Version 1.1 Version 1.0

ciples it has previously presented The track has, in my opinion, at least two flaws:

A defect is on the inconvenience for an operator during the transition from the inner to the outer closed ring of the various modules (although the route point to point), it can only do this bending and moving under one of the modules.
also increasing the height of the modules I consider this an inconvenience.

Another, more serious, is related to the curvature of the track entrance to the terminal: making it a test of the same drawing, I got ray unacceptable for a station and this would have gone to the expense of realism.
It is all down to the fact that, using a 1:1 scale of the figures, it is difficult in some cases allocated consecutively in the exact position, especially if you want to develop the curves.

Hence the decision to change the path, but not upset at all, because the theme seems to me acceptable.

So I opt for a solution with modules that do not close the loop structure, but leave a minimum of free passage for an operator who wanted to go outside the room or even move from the outside of the plastic.

Also part of the path curve is necessarily used to the full line, provided with wide, while the terminus and the secondary develop in a straight line: better, in fact, a full line curve in a wide-ranging station in the main curve rays with more and more narrow and unrealistic ...



As can be seen from the figure, drawn on paper to scale 1:5, the line runs from the terminus of Massaradica (equal to 170 cm in length), but I would like to split into two separate modules to facilitate transport (you never know ...).

The station has three main tracks of incoming trains, with the possibility to ride the locomotive and the track ends at module wire terminal though, because in future it may be possible largely in this direction. In addition there are 3 other Tronchin of call, and 2 joined by a long load floor with cargo warehouse large enough, but this is still the "old" warehouse.

From Rome there are 2 connectors industrial

toward an adjacent module that has the two sever Italsementi SpA (for the use of a spindle for the station) and their silos, the other on the following form adjacent to the station, where the cement plant is "Health", also with 2 Tronchin (incoming raw materials (sand, gravel, etc. ..) and start semi-finished / finished goods (big-bag of various cements)).

on this form is also a stop for two nearby towns: Borgofino - San Fedele.

Continuing we arrive at the station of Saint Andrew Vago of 140 cm in length, consists of two tracks, in one stroke and another doubling, plus a storage sever. And 'this another sever to use the Local Agricultural Cooperative, slightly displaced.

From the main part, in the opposite direction, a connection to the Company Ortofrutticola "Green". It is therefore an area dominated by agriculture, but enough for the sales and distribution of its products.

Therefore, following the advice of Mario "Cretaz" , the corners are so exploited in factories.

The track ends with a slide rest of the world "Vago called Central, which is the imaginary city, next to St. Andrew Vago, and from which trains can go to other imaginary destinations.


PS In the meantime came the necessary binaries, and then as soon begin the construction

PS2 I got 7 new goods wagons (4 mini-blocks type I and 3 2-axle grain hopper wagon bogie type I Uc), in addition to the open wagons, type E and G closed wagons, which will present all again.

Sunday, August 9, 2009

Corpration Webcam Software



The project, as already stated, consists of a single track line linking "MASSARADICA" (a media center with a terminal station of importance) to "vague" (represented here by a drawstring at 8 tracks).
Massaradica Downtown is also home to a factory-storage timber (LARADICE ") and furniture (" home ").



From Massaradica in Vago you meet before a freight station with motorway and rail center of a seed storage silos with a variety of property of the company ITALSEMENTI SpA, and a center loading and unloading fruits and vegetables ("GREEN "VEGETABLES sas).
The inhabitants of two villages about 4-5 km away from the small airport, and BORGOFINO San Fedele, have repeatedly sought and received by the railway passengers FS some stops during the day.

Further down the line you get to the station SANT'ANDREA VAGUE.
A consortium of local agricultural products for the DOP has decided to "rent" sever in a station for use by a dozen farms. There is also a workshop ("MECHANICS") with 2 Tronchin (arrival and departure of raw materials, semi-finished products processing waste).
As mentioned earlier, to continue to SANT'ANDREA VAGUE VAGUE (station-drawstring VAGUE CENTRAL), hence the link can proceed to some imaginary destinations.

The coverage area of \u200b\u200bthe model consists of a rectangle of dimensions 160 cm x 340 cm.
The drawstring and two modules of the terminal station and the adjacent service yard were already in existence prior to completion of this project (the slide is complete and at least the structure are the other two).

Monday, July 13, 2009

How It Looks When Man Ejaculates Into A Woman

Project Start Project

After the last experience of Brescia FREMO a few days ago, I decided to revisit some ideas developed in recent months on a draft of an N scale model with realistic exercise.

The main idea is to have more than one station in which the sessions unfold, but the idea of \u200b\u200bmultiple stations is equivalent to having more space: so what?

studying the usable portion of the room (for "courtesy": a wall with its angles, practically a horseshoe), I planned on doing a single-track line between two terminal stations "T1" and "T2" (post across the horseshoe), the center of the "horseshoe" an exit "C" (Perhaps with priority track), which is also a small goods yard with 2 sever, this box "C" is also a junction which allows a drawstring detour to "M" (the world), which then branches off in the middle of "horseshoe."



In practice the main line consists of "T1" - "M" (passing through the toll booth "C", using the fork function), while there is a secondary line that branches off from the junction to "T2 ", home to several industries (ie freight + commuter workers).

soon as possible I will try to put up two sizes and make a project team and pencil on a sheet of paper, to make more account of the measures available.
Another task will be to frame the project geographically, to create areas and functionality.

Thursday, July 2, 2009

Letter Of Good Standing For Dentist

"Gathering shivering N" Brescia (20 June 2009) CROSSROADS STATION

15 days ago, I participated for the first time to finally meet brakes (N) in Brescia.
The experience was really exciting for me and report here some photos taken during the meeting.

FINAL station, which was run by Anthony Rosano (which he also built)





A little 'landscape of the various forms of open lines







During the meeting was "driver" of several passenger trains (freight traffic for the time being I'm still a bit 'hard). "Marconi", pictured, was the conductor who assisted me during my first three conduction.





Here are two passenger trains that have been commuting between FINAL and Farnese (slide) with me driving.



Some stations call-really well done



POGGIONOVO


VALLEY




Some special VALLEY (previous 3 photos)


GLASSES Vignola and Sons


Bivio BRICK


Detail CARTIERA


Finally, the separate room of the leaders Unica (superbly directed by Alex Corsico) before the start of the sessions.



Even an experienced and multi-decade cycles (approaching retirement ..;)) Mario can happen as a moment of loss ("... but what is the race track looks ?..."); video (10 MB)




Other video (31MB)


Sunday, January 18, 2009

Pokemon Silver Metal Jacket Location



Another possible solution the dilemma of the model operating in a small space is as follows: a transit station to a main line, which also serves as a crossroads and grafting for a line secondary single track.
The doubling of the main line is only one side of the path, that from the transit station continues true south, while it is being built in the north side.

Also near the station there are 2 factories (each with a sever and two respectively), while the station has two tracks for more Carri auction for maneuver.
Depending on whether you have a single wall (at least 4 meters) or a wall-to-L you can get the following two solutions, both with 2 slide to "the rest of the world."

First solution (wall to L)


Second solution (single wall, but longer)