Friday, February 12, 2010

Recurring Deposit Calculator Manual Calculation

Last Time modules and setting new plastic

I finally finished the structure of all the modules of the project.
The last two modules are in a station with two tracks (one running and one double) plus one for the warehouse, connected by a link with a cement plant, and finally the second slide, which ends this second branch rail. The latter is built with a tilting system, to fill its space only during operational use during the sessions.

Overview of the two modules


Drawstring POWER (plan ready to use)


Drawstring POWER (closed plan)


Station Bernalda


I thought, also, the environment trying to use the names of stations that actually exists, even if these are not real representations. So I decided to take my old idea: the terminus Metaponto from whose department will be two lines, one to the power (through first to Bernalda) and the other to Taranto (via Ginosa).

0 comments:

Post a Comment